Challenges for Deploying Flexible 4G Infrastructure
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.76 MB
|
|
A Path Towards a Unified Remote Radio Head Interface?
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.36 MB
|
|
Antenna Aspects of MIMO Deployment
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.85 MB
|
|
Are a New Set of Future Base Station Interface Standards Needed ?
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.02 MB
|
|
BridgeWave Communications, Specializing in 60-90 GHz
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.06 MB
|
|
Cost Effective Materials for Boosting 4G Efficiency and Gain
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.54 MB
|
|
Efficiency and Flexibility? Too good to be true?
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.85 MB
|
|
Flexible 4G BaseStation Architectures - Opening Materials
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.34 MB
|
|
Flexible Transceivers for Future 4G Base Stations
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.77 MB
|
|
GSM & UMTS Network Deployments – Lessons Learned
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.37 MB
|
|
Legacy Networks and Future Bolt-on Solutions
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.07 MB
|
|
MIMO Considerations for Base Station Antennas
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.25 MB
|
|
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
3.29 MB
|
|
Mobile Infrastructure – A Changing Landscape
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.68 MB
|
|
OBSAI / ìTCA Base Station Architecture and Applications
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
7.21 MB
|
|
Platform Requirements for a Flexible Backhaul Design
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.84 MB
|
|
Power Amplifier and Linearization Architectures for 4G
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.63 MB
|
|
Regulation of Mobile Bands: Today and Tomorrow - Towards increasing the flexibility of spectrum use
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.44 MB
|
|
The Challenges of Next Generation Technology Deployment: A Familiar Story?
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.83 MB
|
|
The impact of a truly open digital radio interface standard (lessons learned from CPRI & OBSAI)
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.04 MB
|
|
The role of FPGAs in modern base station design
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
1.25 MB
|
|
Unified Architecture - Solutions for Evolution Challenges
|
Size
|
|
|
06/2008
|
|
Infrastructure Equipment
|
0.83 MB
|
|