Applications Engineering Note: Corning Cable Systems Outdoor Cable Jacket Material - Medium Density Polyethylene
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.15 MB
|
|
Applications Engineering Note: Outdoor Cabled Optical Fiber Lifetime Reliability
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.14 MB
|
|
Article: Why Directional Couplers Are Better For High Power Measurements vs. Attenuators
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.11 MB
|
|
Backhaul Challenges in an Unlimited World
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.16 MB
|
|
Backhaul Network Architecture, Synchronization and Security for LTE
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
4.78 MB
|
|
Backhaul Requirements: Year 2015
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.14 MB
|
|
Building Adaptable & Scalable Backhaul Network Solutions
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.76 MB
|
|
Carrier Ethernet & TDM: Network Transport Solutions for Wireless Backhaul
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
3.21 MB
|
|
Challenges and Solutions for Wireless Backhaul Any Media Access
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
2.41 MB
|
|
Comcast Business Services
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
3.85 MB
|
|
Competition or Synergy? Logistical and Economic Tradeoffs for Optical Versus Microwave Backhaul
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
2.13 MB
|
|
Considerations for Building a 2G/3G/4G Backhaul Network
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.13 MB
|
|
Deployment Experiences in End-to-end Synchronization of IP Backhaul
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.07 MB
|
|
Fiber Optic Cable - Total Installed Cost (And How to Reduce It)
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.29 MB
|
|
Implementation Challenges of Microwave or Fiber Backhaul
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
5.81 MB
|
|
Initial Thoughts on LTE Advanced for 3GPP Release 10
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.27 MB
|
|
IWPC Opening Materials LTE & WiMAX Backhaul Summit North America, 2010
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.47 MB
|
|
LTE Backhaul Considerations
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.63 MB
|
|
MMW Technology Industry Review and Deployment Scenarios
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.58 MB
|
|
Multiservice Backhaul in Flat IP Networks
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.36 MB
|
|
Smiths Protection Technology Group Lightning Protection
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
0.5 MB
|
|
Thinking Differently About Backhaul: Satellite Solutions
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.7 MB
|
|
Tradeoffs and Economics of a Hybrid Fiber-Microwave Backhaul Architecture
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
1.56 MB
|
|
Will a 3000 U$D Gigabit mmWave Link Change the Wireless-Fiber Balance?
|
Size
|
|
|
01/2010
|
|
Infrastructure Equipment, Millimeterwave Initiative
|
3.36 MB
|
|