A Look at Life Cycle Cost: Transmission Line Impact on Network Design, Installation, Operating Expenses and Long Term Reliability
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
1.09 MB
|
|
Access and Core Point To Point Terrestrial Radio for the Provision of Backhaul in the UK
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.12 MB
|
|
Adaptive Digital Predistortionand Hybrid Transceiver Design and Test for 3G radios
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.9 MB
|
|
Antennas For More Efficient Usage of Tower Real Estate
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.76 MB
|
|
Application of High Voltage HBT Technology to Improve Base Station Efficiency
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.5 MB
|
|
Brush Ceramic Products: Use of BeO in High Powered Applications
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.19 MB
|
|
CAPEX vs Efficiency: The Search for the ‘Sweet Spot’
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.24 MB
|
|
Contribution of Advanced Antenna Systems to OPEX Reduction: Principles and Applications
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
1.54 MB
|
|
Cooling The System: How Can We Move that Heat?
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
1.23 MB
|
|
CPRI-Based Economics of Tower Top Electronics
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
1.68 MB
|
|
Dual Approach to OPEX Savings
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.92 MB
|
|
Executive Summary - Lowering BaseStation Equipment OPEX
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.24 MB
|
|
How Do We Make Money on a $5 ARPU Customer and How Do We Get There?
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.34 MB
|
|
IWPC Opening Materials, BaseStation OPEX Workshop
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.15 MB
|
|
Minimizing Network Costs Through Strategic Collocation
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
2.25 MB
|
|
OPEX and "Cost of Ownership"--Reducing Features in Microwave Backhaul Networks
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.57 MB
|
|
Opportunities for OPEX Reduction in the Radio Access Network: Meeting the Challenge
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.73 MB
|
|
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.48 MB
|
|
Photos - taken at the social dinner AND at the T-Mobile tour
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
3.44 MB
|
|
Photos - taken by Art Peltier during tour of T-Mobile's 3G BaseStation
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
13.66 MB
|
|
Silicon LDMOS RF Power Devices and Packages for Wireless Infrastructure
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.87 MB
|
|
Survival and Service of Distributed Tower Top Electronics
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
1.17 MB
|
|
Taking the Backache out of Backhaul
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.39 MB
|
|
The Importance of and Opportunities for High OPEX Reduction
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.96 MB
|
|
The Potential for Reducing Operational Expenditure in UMTS Network Through the Use of Remote Radio Heads
|
Size
|
|
|
09/2004
|
|
Infrastructure Equipment
|
0.35 MB
|
|